Civil & Commercial

We offer a complete package of civil and commercial excavation services:

  • Bulk excavation, trucking and land clearing

  • Utility work: water, sewer, storm, hydro, gas trenching

  • Foundation work and structural fill

  • Perimeter drains and slab preps

  • Paving, curbing and sidewalk

  • Parking lots and road work

  • Demolition

  • Site grading, topsoil installation

  • Retaining walls

Dr. Knox Middle School (2023/2024)

Project Scope: ​

  • Install a 300m3 storm infiltration tank in an existing parking lot

  • 15 inch storm main c/w manholes

  • Bus station c/w lock block wall

  • Foundation excavation and backfill

  • Curbing and asphalt

  • On-site gas and electrical trenching

 

Project Owner: School District No. 23

Pier Mac Industrial Park (2023/2024)

Project Scope: ​

  • 200m of water main feeding two industrial buildings

  • Storm system including detention tank and manholes

  • Sanitary system including 5m deep manhole

  • Curbing and asphalt

  • Foundation excavation and backfill

 

Project Owner: Mckay Property Group

Sysco Remediation (2022)

Project Scope: ​

  • Installation of a 600 gal oil water separator and 750 gal sediment collection tank

  • 3 drywells and associated catch basins

  • Removal and decommission of inadequate existing drywell system

  • Ditching and fine grading for drainage

  • Asphalt cutting & disposal

  • Final grading of asphalt millings in parking lot

 

Project Owner: Sysco Corporation

Harris Rebar Crane Footings (2022)

Project Scope: ​

  • Concrete removals in existing crane footings

  • Concrete strip footings and slab preps

  • Utility locates

  • Footing excavations and backfills

  • Structural fill

  • Aggregate hauling including disposal and imports

  • Final grading

 

Client: Nucor Harris Rebar

Anne McClymont Elementary Daycare (2022)

Project Scope: ​

  • 6 drywells and associated catch basins

  • Foundation excavation and slab prep

  • Perimeter drainage system for building and playgrounds

  • ~130m of waterline c/w hydrant install

  • Sani service and tie in to manhole

  • Offsite catch basins and drywell. New curb and sidewalk and added bus parking

Project Owner: School District No. 23

Black Mountain Elementary Daycare (2022)

Project Scope: ​

  • 4 drywells and associated catch basins

  • Foundation excavation and slab prep

  • Perimeter drainage system for building and playgrounds

  • Waterline c/w hot tap and hydrant install

  • Sani service and tie in to live main

  • Curb, sidewalk and asphalt preps

Project Owner: School District No. 23

Vernon Military Camp:
Kitchen Annex (2022)

Project Scope: ​

  • Foundation excavation, structural fill & backfill

  • Sanitary connection including encasement pipe & manhole installations

  • Watermain hot tapped connection

  • Perimeter drain

  • Parking lots & sidewalk preps

Project Owner: Department of National Defense

Vernon Military Camp:
New Medical Centre (2021/2022)

Project Scope:

  • Tree removals

  • Foundation excavation, structural fill & backfill

  • Sanitary connection

  • Watermain connection

  • Perimeter drain & rock pit installation

  • Parking lots & sidewalk preps

Project Owner: Department of National Defense

Vernon Military Camp:
Ablution Building (2021)

Project Scope:

  • Grubbing

  • Foundation excavation & backfill

  • 90m sanitary connection

  • 25m watermain hot tapped connection

  • Parking lots, curb and sidewalk preps

  • Topsoil installation

Project Owner: Department of National Defense

Bristow Road Boat Launch & Day Use Area (2020)

Project Scope:

  • 3500 sq meter parking lot on Shuswap Lake c/w subbase, base, and final crush surface

  • Washroom building install

  • Drywell installation

  • Habitat restoration 

  • Signage, wheel stops, fencing & access gates

 

Client: Columbia Shuswap Regional District

Lavington Childcare Facility (2020)

Project Scope:

  • Tree removals & grubbing

  • Foundation excavation, infill & backfill

  • Commercial septic system installation

  • Watermain connection

  • Perimeter drain & rock pit installation

  • Parking lots & sidewalk preps


Project Owner: District of Coldstream

Kelowna Integrated Water Project - Phase 1 (2019/2020)

Project Scope:

  • Connect over 150 homes to the new water system

  • Decommission over 100 water services

  • Installation of new water connections, new water meter pits

  • Road restructuring & site restorations

  • 0 utility strikes

Project Owner: City of Kelowna

Contact us for a free quote or proposal!