Civil & Commercial Construction

Flury Earthworks delivers a complete scope of civil and commercial earthworks — from underground utility installation and road construction to full general contracting across multi-trade projects. We are bonded to $11M+, GPS-equipped, and experienced working directly for public sector owners, general contractors, and private developers.

We are often the first trade on site. The work we do sets the foundation — literally — for every trade that follows.

What We Deliver:

  • Underground utilities — water, sewer, storm, hydro, and gas trenching and installation

  • Road construction and reconstruction

  • Site preparation, bulk excavation, and land clearing

  • Foundation excavation, structural fill, and backfill

  • Perimeter drains and slab preparation

  • Retaining walls

  • Paving, curbing, and sidewalk

  • Parking lot construction

  • Demolition

  • Site grading and topsoil installation

  • General contracting — full multi-trade project coordination from award through close-out

Featured Projects:

Hudson Road Elementary, Dr. Knox Middle School, Black Mountain Daycare, Anne McClymont Daycare

School District No. 23 | 2022–Current

Full civil package across four SD23 facilities including site servicing, storm infiltration systems, utility installations, foundation excavation and backfill, road and parking lot construction, curbs, and sidewalk. Repeat contractor across all four contracts.

School District No. 23 — Four Facilities

McKay Property Group | 2023–2024

Full civil package including twinned water main, storm detention system, deep sanitary manholes, foundation excavation and backfill, curbing, and asphalt.

Pier Mac Way Industrial Park

Department of National Defence | 2021–2022

Full civil package across Medical Centre, Kitchen Annex, and Ablution Buildings including foundation excavation and backfill, sanitary construction, watermain hot tap connections, perimeter drains, and parking and sidewalk preparation.

Vernon Military Camp — Three Buildings

City of Kelowna | 2019–2020

Connected 150+ homes to a new municipal water system, decommissioned 100+ existing services, and completed road restructuring and full site restoration.

Kelowna Integrated Water Project — Phase 1

More Projects:

Hudson Road Elementary Addition | School District No. 23 | Current

Full civil package including sanitary ROW realignment, storm services, and watermain works.

PM Automotive | Redline Contracting | 2025

Full civil package including water and sewer servicing, onsite storm system, and foundation excavation and backfill.

Sysco Remediation | Sysco Corporation | 2022

Oil water separator and sediment tank installation, drywells, catch basins, drainage grading, and asphalt works.

Harris Rebar Crane Footings | Nucor Harris Rebar | 2022

Concrete removals, strip footings, slab preparation, footing excavations and backfill, and structural fill.

Bristow Road Boat Launch & Day Use Area | Columbia Shuswap Regional District | 2020

Parking lot construction, washroom building install, drywell installation, habitat restoration, and site furnishings.

Lavington Childcare Facility | District of Coldstream | 2020

Full civil package including foundation excavation, commercial septic installation, watermain connection, and perimeter drainage.

Working on a Civil or Commercial Project?

We'd like to hear about it — whether you're a public sector owner, a general contractor, or a private developer.

info@fluryearthworks.com
250 878 7607